fbpx

18.08.2023 Wyndham Grand Residences Batumi Gonio. Aqua The reinforcement of columns continues on the 12th construction (11th hotel) floor. The wall construction is underway on the 2nd construction (1st hotel) floor. The construction materials are delivered on the 3rd construction (2nd hotel) floor.

2

1518:18