Get a Consultation

← All news

18.10.2023 — Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
18.10.2023 — Elite Family Residence

18.10.2023 — Elite Family Residence — Ceramic block walls are being laid on 2 construction (1 residential), 3(2), 4(3) floors. Construction materials are being loaded on the 4(3) and 5(4) floors.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news