Get a Consultation

← All news

19.09.2024 — Elite Family Residence

Real estatePublished 1 min read0 views
Share:Link copied
19.09.2024 — Elite Family Residence

19.09.2024 — Elite Family Residence — Facade works, laying of external sewerage pipes, installation of plasterboard framework of internal partitions, installation of metal fences, diamond drilling of holes and geodetic drawing of facade lines are continuing. On the ground floor there is wall finishing and electrical installation works - light wiring, installation of inductors. On the first floor - wall finishing. On the third and fourth floors - checking the integrity of cables.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news