fbpx

20.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A the walls are being laid with ceramic block on the floors. In Block B, dismantling of the vertical structure formwork has been carried out. Backfilling of soil and waterproofing of the underground part of the infrastructure building foundation is underway.