20.10.2023 — Elite Family Residence — On the 2nd building (1 residential), as well as on the 3rd (2), 4th (3), the walls are being laid with ceramic block. Building materials are being loaded onto the floors.
20.10.2023 — Elite Family Residence — On the 2nd building (1 residential), as well as on the 3rd (2), 4th (3), the walls are being laid with ceramic block. Building materials are being loaded onto the floors.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st