fbpx

21.08.2023 Wyndham Grand Residences Batumi Gonio. Riviera Block A: The removal of formwork from the columns and structural wall continues. Block E: The reinforcement of the columns continues on the 2nd floor, and the installation of formwork is going on the 1st floor.