21.11.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A In the 1st half, installation of formwork for the 2nd floor floor slab is in progress. In the 2nd half - reinforcement of columns of the 2nd floor Block B Excavation is underway.
21.11.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A In the 1st half, installation of formwork for the 2nd floor floor slab is in progress. In the 2nd half - reinforcement of columns of the 2nd floor Block B Excavation is underway.