22.08.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Ceramoblock walls continue to be laid in blocks A and B. Floor slab formwork is being installed in block B, on the fifth floor, as well as floor slab reinforcement.
22.08.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Ceramoblock walls continue to be laid in blocks A and B. Floor slab formwork is being installed in block B, on the fifth floor, as well as floor slab reinforcement.