23.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, ceramic block masonry is being laid on the second and third floors. Fireplaces are being installed in Block E. Formwork is being installed in the infrastructure building.
23.06.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, ceramic block masonry is being laid on the second and third floors. Fireplaces are being installed in Block E. Formwork is being installed in the infrastructure building.
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Riviera
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Family Club
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. AquaGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st