Get a Consultation

← All news

23.09.2023 — Elite Family Residence

23.09.2023 — Elite Family Residence

23.09.2023 — Elite Family Residence — On the 7th construction (6th residential) floor the reinforcement of columns is carried out. On the 2(1) floor - laying of walls with ceramic block.