24.03.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Block A: the formwork for the floor slab of the 5th floor is being assembled. Block B: reinforcement of the basement floor slab is being carried out.
24.03.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — Block A: the formwork for the floor slab of the 5th floor is being assembled. Block B: reinforcement of the basement floor slab is being carried out.
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Riviera
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Family Club
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. AquaGet personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st