fbpx

24.04.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Loading of ceramic block on the 19th construction (18th hotel) floor is in progress, the laying of walls with ceramic block is in progress. The construction of the capital fence of the hotel complex is underway on the territory.