25.08.2024 — Elite Family Residence

25.08.2024 — Elite Family Residence

25.08.2024 — Elite Family Residence — Air-conditioning routes are being installed. Facade works are in progress: installation of decorative elements of the northern facade, finishing of facades on terraces. The technical rooms of the ground floor are being plastered. Porcelain stoneware for mockup floors has been delivered to the site.