25.11.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Formwork installation of the floor slab of the 18th construction (17th hotel) floor is in progress. Ceramic block wall masonry has started on the 9th (8) floor.
25.11.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Formwork installation of the floor slab of the 18th construction (17th hotel) floor is in progress. Ceramic block wall masonry has started on the 9th (8) floor.