26.08.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block B, the ceramic block on the second floor is being laid and the fireplaces are being laid. In Block C, the columns are being poured with concrete, in Blocks A and B, the staircases are being concreted, and in Block E, the parapets are being plastered.