fbpx

26.09.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — The concrete of the floor slab on the 15th construction (14 hotel) floor is gaining strength and we can start the geodetic layout of the columns and the installation of the fence posts. On the 5th construction floor (4 hotel floors) the walls are being laid with ceramic block.