26.10.2023 — Elite Family Residence — On 2 construction (1 residential), 3 (2) and 4 (3) the laying of walls with ceramic block continues. Loading of construction materials on the floors is in progress.
26.10.2023 — Elite Family Residence — On 2 construction (1 residential), 3 (2) and 4 (3) the laying of walls with ceramic block continues. Loading of construction materials on the floors is in progress.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st