Get a Consultation

← All news

27.08.2024 — Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
27.08.2024 — Elite Family Residence

27.08.2024 — Elite Family Residence — Installation of suspended ceiling profiles, installation of metal railings, umbrellas on ventilation shafts is in progress. Stained glass windows are being installed. Finishing works on the facade and roof ventilation shafts are in progress. On the second floor electrical installation works are in progress, and on the ground floor - plastering of walls of technical premises. Floor tiles are being laid in the mockup bathroom. Railings have been delivered to the site.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news