28.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — On the second floor of block A the walls are being laid with ceramic block. The drainage system is being installed. In Block B, the installation of the floor slab formwork continues.
28.04.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — On the second floor of block A the walls are being laid with ceramic block. The drainage system is being installed. In Block B, the installation of the floor slab formwork continues.