28.08.2024 — Elite Family Residence — Installation of drywall rails on the walls of bathrooms, installation of metal railings and floor tile laying is in progress. Stained glass windows are being installed. Works on finishing of the facade and ventilation shafts on the roof are in progress. Electrical installation works are being carried out on the fifth floor, and plastering of the walls of technical rooms is underway on the ground floor.