28.08.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block B - cutting of holes for chimneys of fireplaces (completed), masonry of fireplaces, masonry of parapet, on the second floor - masonry of ceramic block, on the third floor - dismantling of formwork. In block C - installation of formwork. In block E - plastering of the parapet. Delivery, unloading and lifting of the ceramic block to the floor.