Get a Consultation

← All news

29.07.2024 — Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
29.07.2024 — Elite Family Residence

29.07.2024 — Elite Family Residence — Installation of heating systems, cold/hot water supply, low-current fire extinguishing system and GKL frames in common areas is in progress. The masonry of elevator portals with gas-silicate block is in progress. Painting works are going on 2 construction (1 residential), 3 (2) floors and mocap. The screed is being applied.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news