30.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Reinforcement of the floor slab of the 17th construction (16th hotel) floor has been completed and concreting has been carried out. On floors 5 (4), 6 (5) and 7 (6), ceramic block wall masonry continues.