fbpx

31.08.2023 Wyndham Grand Residences Batumi Gonio. Aqua The formwork installation for the columns is in progress on the 13th construc-tion (12th hotel) floor. The construction of ceramic block walls continues on the 2nd construction (1st hotel) and the 3rd construction (2nd hotel) floors.