Elite Family Residence

1. Finishing work.
— Installation of moldings.
— Laying porcelain stoneware.
— Facing travertine on the balconies.

2. Facade works.
— Plastering terraces.
— Plastering ceilings of balconies.
— Facing the facade of natural stone.

3. landscaping.
Facing with stone retaining wall.

4. Arrangement of mocap.
Furniture installation.

5. Electrical installation works.
Installation of lighting fixtures.