Elite Family Residence
1. Finishing work.
— Installation of moldings.
— Laying porcelain tiles.
— Painting work, 5th floor.
— Facing travertine on balconies.
2. Facade works.
3. Arrangement of the railing of the central facade.
Painting of balusters.
4. electrical installation works.
5. Installation of interior doors.
6. Installation of railings in penthouses.