fbpx

Elite Family Residence

1- Finishing work.
— Painting works in the units, 5th floor.
— Laying porcelain tiles on balconies and terraces.
— Facing of balconies with travertine.

2. Waterproofing works.
On the parapet of the roof.

3. landscaping, infrastructure.
Facing the retaining wall with stone.