Elite Family Residence

1- Finishing work.
Travertine cladding on balconies.

2. Facade works.
— Puttying of joints of decorative figures.
— Painting of terraces and decorative elements.

3. Installation of interior doors, 2nd floor.

4. Electrical installation works.
Installation of finishing electrics in the units.

5. Installation of plasterboard frame.
Works on the -1 floor in the common areas.

6. Installation of railings on the staircases.