Elite Family Residence

1. finishing works.
— Facing marble staircases.
— Facing travertine on the balconies.

2. Facade works.
— Puttying the joints of decorative figures.
— Painting of terraces and decorative elements.

3. Installation of interior doors.

4. Electrical installation works.
Installation of finishing electrics in the units.

5. Installation of plasterboard frame.
Works on the -1 floor in common areas.