Elite Family Residence
1. finishing works.
— Laying of porcelain tiles.
— Painting work, 5th floor.
— Facing travertine on balconies.
2. Facade works.
— Application of decorative plaster on terraces.
— Painting of terraces and decorative elements on the facade.
3. Arrangement of facade railings.
Painting of balusters.
4. Electrical installation works.
Installation of pure electrics.
5. Installation of interior doors.
6. Installation of glass railings in penthouses.
7. Plumbing works.