Elite Family Residence
1. finishing works.
— Laying porcelain stoneware on balconies.
— Installation of moldings.
— Laying of porcelain stoneware skirting on the terraces.
— Painting works in the units, 5th floor.
2. Facade works.
Facing with natural stone.
3. landscaping.
Facing the retaining wall with stone.
4. Installation of railings of the central facade.
5. electrical installation works.