Elite Family Residence
1. Finishing works.
— Painting.
— Puttying of the ceiling in the units, the 4th floor.
— Puttying of the walls, penthouses.
— Installation of moldings, the 4th floor.
— Porcelain stoneware installation for elevator gantries.
2. Facade works.
— Cladding the facade with natural stone.
3. Installation of staircases railings.