Elite Family Residence

1. Finishing works.
— Painting.
— Puttying of walls, preparation for painting, the 4th, 5th floors.
— Installation of moldings, the 2nd floor.
— Porcelain stoneware installation, the 5th floor.

2. Facade works.
— Cladding the facade with natural stone.
— Plastering of the terraces

3. Installation of railings for staircases.