Elite Family Residence
1. Finishing works.
— Painting, the 1st, 3rd, 5th floors.
— Laying of porcelain stoneware on elevator portals.
— Installation of marble wind sills.
— Laying marble on staircases.
— Installation of moldings.
2. Waterproofing.
— On the balconies.
3. Installation of railings on the staircases.