Elite Family Residence
1. Finishing works.
— Painting, the 1st, 3rd, 5th floors.
— Laying of porcelain stoneware on elevator portals.
— Installation of marble window sills.
— Laying marble on staircases.
— Installation of moldings.
2. Facade works.
— Facade cladding with natural stone.
3. Installation of drywall framing.
4. Floor screeding.
On the terraces, the 5th floor.
5. Installation of railings on the staircases.