Elite Family Residence
1. Finishing works.
— Painting, the 1st, 3rd floors.
— Laying of porcelain stoneware on elevator portals.
— Marble cladding for the fire places, the 5th floor.
2. Facade works.
3. Installation of the staircase railings.
4. Insulation system installation.
5. Wiring.