Elite Family Residence
1. Finishing works.
— Painting, the 1st floor.
— Laying of porcelain stoneware on elevator portals.
— Marble cladding for the fire places, the 5th floor.
2. Installation of the staircase railings.
Elite Family Residence
1. Finishing works.
— Painting, the 1st floor.
— Laying of porcelain stoneware on elevator portals.
— Marble cladding for the fire places, the 5th floor.
2. Installation of the staircase railings.
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Villas
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Riviera
Monthly Construction Report December 2025. Wyndham Grand Batumi Gonio. Family Club