Elite Family Residence
1. Finishing works.
— Painting, the 3rd floor.
-Laying of porcelain stoneware on elevator portals.
2. Installation of the railing.
Due to weather conditions, no other construction work is underway at the site.
1. Finishing works.
— Painting, the 3rd floor.
-Laying of porcelain stoneware on elevator portals.
2. Installation of the railing.
Due to weather conditions, no other construction work is underway at the site.