Elite Family Residence

1. Finishing works.
— Painting, the 4th floor and common areas.
— Cladding the fire places with the marble.
— Laying of porcelain stoneware on elevator portals.

2. Wiring.
Mounting of luminaires.

3. Installation of drywall framing.

Due to weather conditions, no other construction work is underway at the site.