Elite Family Residence
1. Finishing works.
— Painting, the 4th floor and common areas.
— Cladding the fire places with the marble.
— Laying of porcelain stoneware on elevator portals.
2. Wiring.
Mounting of luminaires.
3. Installation of drywall framing.
Due to weather conditions, no other construction work is underway at the site.