Elite Family Residence
1. Finishing works.
— Painting, the 4th floor and common areas.
— Puttying of walls, preparation for painting, the 5th floor.
2. Facade works.
— Cladding the facade.
3. Wiring.
Mounting of luminaires.
4. Installation of drywall framing.