Get a Consultation

← All news

Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
Elite Family Residence

Elite Family Residence

1. Finishing Works
Painting works in units, 1st, 2nd floors.
Painting works in common areas.
Tile installation, 5th floor.
Porcelain tile installation in bathrooms.

2. Facade Works
Cladding the facade with natural stone.

3. Waterproofing Works
On balconies.

4. Installation of Vapor Barrier and Insulation on Terraces.

5. Mock-up Installation
Furniture assembly.

6. Floor Screed Installation on Terraces.

7. Installation of Engineering Systems
Water supply installation, pipe mounting.
Ventilation installation in technical rooms.

8. Electrical Installation Works
Installation of sockets, switches, and lighting fixtures.

9. Installation of Railings on Stair Flights.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news