Elite Family Residence
1. Finishing Works
Painting works in units, 1st, 2nd floors.
Painting works in common areas.
Tile installation, 5th floor.
Porcelain tile installation in bathrooms.
2. Facade Works
Cladding the facade with natural stone.
3. Waterproofing Works
On balconies.
4. Installation of Vapor Barrier and Insulation on Terraces.
5.
Furniture assembly.
6. Installation of Screed on Terraces and Balconies.
7. Installation of Drainage Traps on Balconies.
8. Plumbing Works
Installation of sockets, switches, and lighting fixtures.
9. Installation of Railings on Stair Flights.
10. Landscaping Works, Waterfall Installation.
Installation of circulation pipes for the waterfall.
Reinforcement of the foundation slab for the waterfall.