Elite Family Residence
1. Finishing works.
— Painting works in units, 2, 5th floor.
— Tile grouting in bathrooms, 5th floor.
— Laying of porcelain tiles in vestibules.
2. Facade works.
Facing the facade with natural stone.
3. Floor screed works.
On the balconies.
4. Waterproofing works.
On terraces.
5. Improvement of the territory, infrastructure.
Stone lining of the pool wall.
6. Installation of gypsum plasterboard frame.
Installation of gypsum plasterboard on the ceiling of the staircase, 1st floor.