Elite Family Residence
1. Finishing works.
— Porcelain stoneware installation, the 1st- 5th floors.
— Installation of porcelain stoneware skirting board in the common areas.
— Puttying the ceiling, the 4th floor.
— Puttying of the common areas.
— Installation of moldings and skirting boards, the 3rd- 4th floors.
— Tile grouting, the 5th floor.
2. Facade works.
— Cladding the facade with natural stone.
— Installation of the railings of the central facade.
3. Installation of staircases railings.