fbpx

Elite Family Residence

1. Installation of ceramic granite tiles in the bathrooms, penthouses.
Continued ceramic granite tiling work.
2. Finishing works.
— Finishing works on the 1st, 2nd, 5th, floors.
— Molding installation.

3. Facade works.
Installation of the decorative elements.

4. Wiring and plumbing.

5. Paving with travertine of the balconies’ parapets, penthouses.

6. Elevator installation.