Elite Family Residence
1. Installation of ceramic granite tiles in the bathrooms, penthouses.
Continued ceramic granite tiling work.
2. Finishing works.
— Finishing works on the 1st, 2nd, 5th, floors.
— Molding installation.
3. Facade works.
— Installation of the decorative elements.
— Priming of balconies on the central facade.
— Decorative plastering of balconies in the north wing.
4. Wiring and plumbing.
5. Paving with travertine of the balconies’ parapets, penthouses.
6. Elevator installation.
7. Installation of polyurethane railings of the central facade, 3rd floor.