Elite Family Residence

1. Installation of ceramic granite tiles on the balconies of the units.
Continued ceramic granite tiling work.
2. Finishing works.
— Installation of moldings and baseboards, the 1st floor.
— Marble tiling of the staircases.
— Puttying of walls on the 2nd — 5th floors.
— Finishing of walls in the penthouses.
— Painting.
— Tiling.

3. Facade works.
Installation of the decorative elements on the balconies.

4. Plumbing.
Bathtubs are being installed.

5. Installation of the pilasters.

6. Paving with travertine.