Elite Family Residence
1. Installation of porcelain stoneware tiles, penthouses.
— Continued porcelain stoneware tiling.
2. Finishing works.
— Finishing works, on the 1st — 4th floors.
— Tiling on the terraces the 3rd — 5th floors.
— Installation of moldings and skirting boards on the 2nd, 4th, 5th floors.
— Marble facing of staircase steps.
3. Facade works.
— Painting of the balconies of the central facade.
— Decorative plastering of balconies of the central facade.
— Priming of balconies of the central facade.
4. Wiring.
5. Elevator installation.
Interim acceptance procedures for commissioning.
6. Installation of polyurethane railings of the central facade, the 4th floor.
7. Drywall frame installation.
8. Installation of fire safety doors.