Elite Family Residence
1. Installation of porcelain stoneware tiles, penthouses.
— Continued porcelain stoneware tiling.
2. Finishing works.
— Finishing works on the 1st, 2nd floors.
— Tiling on the terraces the 3rd — 4th floors.
3. Facade works.
— Puttying of balconies of the central facade.
— Priming of balconies on the central facade.
— Decorative plastering of balconies.
4. Plumbing and wiring.
5. Elevator installation.
Ongoing works.
6. Installation of polyurethane railings of the central facade, the 3rd floor.