Elite Family Residence

Elite Family Residence

Elite Family Residence — 1. Plumbing. - Heating connection, monitoring of temporary heating. - Installation of drainage system on balconies on the 4th-5th floors. 2. Installation of ceramic granite tiles in bathrooms, units on the 3rd floor. Continued ceramic granite tiling work. 3. Finishing works. - Second coat of plastering walls and ceilings in units on the 2nd floor. - Tiling of the loggias on the 2nd floor. - Preparation and installation of marble baseboards on the 2nd floor. - Installation of guides for drywall on the bathroom walls on the 6th floor. 4. Facade works. - Installation of decorative elements on the balcony parapets - 6 decorative elements installed. - Plastering of joints for the decorative elements on the eastern facade.